2.9.1 Employers will provide accommodation or a Living
Out Allowance (“LOA”) to Employees whose Principal
Residence is outside of an 85 km radius from the Project site.
Residents of Fort McMurray, Anzac and Saprae Creek will be
considered to be within the 85 km radius. Employees up to and
including the level of General Foreman will be eligible for
camp accommodation. HCML has the sole discretion to determine
which Employees will be provided with on-site camp
accommodation, off-site accommodation or when Employees will
be provided with an LOA.
2.9.2 Employees who are provided with off-site
accommodation, which is outside of a 30 km straight line
radius from the Project site, will be provided a
transportation allowance of $25.00 per day worked
2.9.3 Employers will establish a subsistence rate and an
LOA rate for Employees who are eligible for camp accommodation
but for whom camp accommodation is not provided. The
subsistence and LOA rate will be based on terms and conditions
in relevant collective agreements, or practices in the area,
and will be subject to HCML approval. In addition to the LOA,
these Employees will be provided:
-
a transportation allowance of $25.00 per day
worked for those Employees whose alternative accommodation
is outside of a 30 km straight line radius from the Project
site; and,
-
access to the transportation provisions, but
not the travel allowance provisions, in Article 2.8.7 Daily
Travel for Local Residents.
2.9.4 Camp facilities and catering services will be of a
comparable standard for all on site
construction camps.
- The following are camp conditions:
- Self-packed bag lunches (mid-shift meals) will be made
available to camp
residents prior to leaving camp for the start of the shift.
- HCML’s or the Owner’s camp policy and rules will
apply to all
Employees staying in camps on the Project site.
- A camp steering committee will be formed to provide
advice on and/or resolve
issues relating to on site camp conditions and disputes.
The mandate of this
committee will be defined by HCML and the Owner in the camp
policy and rules.
2.9.5 Any rights of access to Project camp accommodation
created by this Agreement, or any documents referred to in
this Agreement, are expressly subject to the rights of the
Owner and/or HCML to assert their rights as owner, manager, or
occupant of the Project and the camp management to deny or
restrict access to the Project accommodation to any person.
|
|